The Bernina railway line (; ; ) is a single-track railway line forming part of the Rhaetian Railway (RhB). It links the spa resort of St. Moritz, in the canton of Graubünden, Switzerland, with the town of Tirano, in the Province of Sondrio, Italy, via the Bernina Pass. Reaching a height of above sea level, it is the highest railway crossing in Europe and the third-highest railway in Switzerland. It also ranks as the highest adhesion railway of the continent, and—with inclines of up to 7%—as one of the steepest adhesion railways in the world. The elevation difference on the section between the Bernina Pass and Tirano is , allowing passengers to view glaciers along the line.
On 7 July 2008, the Bernina line and the Albula railway line, which also forms part of the RhB, were recorded in the list of UNESCO World Heritage Sites, under the name Rhaetian Railway in the Albula / Bernina Express Landscapes. The whole site is a cross-border joint Swiss-Italian heritage area.
Trains operating on the Bernina line include the Bernina Express.
The line opened from onwards, in several sections: on 1 July 1908 between Pontresina and Morteratsch, and between Tirano and Poschiavo; on 18 August of the same year between Pontresina and Celerina; and on 1 July 1909 between Celerina and St Moritz, and between Morteratsch and Bernina Suot. It was only on 5 July 1910 that the whole line could be opened, upon completion of the most difficult section between Bernina Suot and Poschiavo. The line was electrically operated with DC current from the start. In 1935 the voltage was increased from 750 to 1000 volts.
Originally, the Bernina line was intended for use only in summer, but in 1913/14 the BB commenced winter operations as well. This development was associated with major weather-related problems, necessitating further erection of avalanche barriers.
In the first years of its existence, the BB was always on the verge of bankruptcy. The costs of construction expenditure on the line to 1915 amounted to around 15 million Swiss francs. Even the introduction of a Dining car in 1928, and packages for tourists, could not save the little railway company from ruin. Due to its difficult financial situation, it was taken over by the Rhaetian Railway in 1943.
The RhB modernised the line fundamentally, also for military reasons, and completely renewed the section at the top of the pass. Previously, the line formation on the north ramp of the Bernina Pass had been laid out in curves giving passengers extensive views, but also lying in the path of avalanche courses. The new parts of the line cut off those curves, the overhead lines and the flat bottomed rails of the old formation were removed, but the substructure is still visible in the high mountains.
Since the mid-1980s, the Rhaetian Railway has been marketing the natural and technical attractions of the Bernina line specifically to tourists. Thus, the section from Pontresina to Tirano forms part of the route of the Bernina Express. In October 2011, it was the first railway line in the world to be photographed and put on Google Street View.
The next station in Pontresina represents, together with St Moritz station, a curiosity in the network of the RhB: two completely different electrification systems meet here. The 11 kV AC powered trains, which enter the station on the line from Samedan, use tracks 1 to 3, while the 1,000 V Direct current powered Bernina trains use tracks 3 to 7. Track 3 has a catenary that can be switched from alternating current to direct current, and a special signal to display to train crews the type of current being used. By means of track 3, the trains using the core network (from Samedan) and the Bernina line trains can use the same line, despite their differing electrification systems. On track 3 is also the exchange of locomotives for the famous Bernina Express, which operates between Chur or Davos Platz and Tirano.
The line now turns to the south east. After crossing the Rosegbach, passing through the Surovas station (which was previously called "Sans Souci" ( Carefree)), and crossing the Berninabach, it reaches Morteratsch station, about below the Morteratsch Glacier. Past the other end of the station is the world-famous Montebello Curve, where the line meets the road over the pass. The line and the road will now accompany each other as far as Ospizio Bernina. At the recently modernised Bernina Suot passing loop, the tree line has already been reached. The next stations are Diavolezza and Bernina Lagalb; both are departure points of .
The next section is probably the most interesting on the north side of the pass. Here, the route is very winding, and moves from one side of the valley to the other. First, the Berninabach is crossed, using the long Lower Berninabach Bridge, and then the line crosses the Arlasbach, a tributary of the Berninabach. On the Upper Berninabach Bridge, the line moves back to the eastern side of the valley. Southwest of here, the Piz Bernina and the Piz Palü rise majestically. Next follows the long Arlas Gallery, which provides protection against snow drifts. On the southwestern side are the small lakes known as Lej Pitschen and Lej Nair. Directly behind them towers the high and long Lago Bianco dam, which also marks the watershed between the Danube and the Po.
The railway now runs along the eastern bank of the lake, and, near Ospizio Bernina, reaches its highest point, at above sea level. The Bernina line is thereby (mountainside railways excluded) the highest railway line in the Alps, operating as a public railway with year-round traffic. As the section from here to Poschiavo is particularly badly affected by drifting snow, countless engineering structures have been erected from the southern dam wall onwards: the long Scala Gallery, the long Scala Tunnel, the Sassal Mason Gallery, even longer at , and the long Drago Tunnel.
After the Grüm Gallery, the attractive Alp Grüm station is reached. It not only is located at the tree line, but also marks the last station before the Italian linguistic border. From here onwards, the line clambers, with a gradient of up to 7%, and via multiple s-bends, downwards into the Poschiavo valley. That this occurs without the assistance of a rack railway system makes the Bernina line one of the steepest adhesion railways in the world.
Immediately behind the Alp Grüm station, the line winds in a tight 180° bend, and passes below Alp Grüm through the Upper Palü Gallery. In a further 180° bend, it heads through the Palü Tunnel and subsequently through the Lower Palü Gallery. A further four half circle loops follow, until the line reaches the Cavaglia station. Since about 2000, there has also been a new automatic passing loop, Stablini, between Alp Grüm and Cavaglia. It bisects a portion of the line that was previously prone to traffic delays. In zigzag fashion, the line continues from Cavaglia further down into the valley via Cadera to Privilasco. From there, the line leaves the tight bends behind, and, still at its maximum gradient, reaches the Poschiavo Valley. In Poschiavo it meets up once again with the Bernina Pass road.
At the request of the Poschiavo community, the station at Poschiavo was built just outside the village boundaries. It has a railway depot and workshop, in which a few historic railcars of the Bernina line are also stored. The remaining section of line of approximately to Tirano are laid partially still as a mountain railway, but also partially in the manner of a tramway system. After the stopping point Li Curt, erected only in 1977, the line ends up running on a street in the village of Le Prese. Between Le Prese and Miralago the line passes along the banks of the Poschiavo Lake, thus remaining at the lake's altitude of above sea level.
Below Brusio, the railway has, as its last highlight, the Brusio spiral viaduct, which serves only to adjust the altitude of the line. The spiral viaduct is followed by the stopping point for the village of Campascio, which still belongs to Brusio. Beyond the border station of Campocologno, which is unusually large due to its customs facilities, the line reaches Italy, and, after crossing the main square of Tirano, its terminal station. Here, the Bernina line meets the standard gauge station and line of the Italian state rail infrastructure company Rete Ferroviaria Italiana (RFI), which links Tirano through Valtellina to Milan.
This fleet, consisting of , also has freight cars. Some freight cars are added to passenger trains until the maximum towing capacity of such trains of is reached. For reasons of safety, due to the presence of dangerous goods, other freight cars are operated in pure freight trains. Despite being set up originally only for tourist traffic, the Bernina line now also assists trade with Italy by carrying considerable quantities of freight, consisting mostly of heating oil, and timber. Additionally, the regional shopping businesses of the Poschiavo valley are served partly by rail.
The timetable is tightly designed, with year-round services of one passenger train per hour in each direction. The flagship services are the now fully panorama car-equipped Bernina Express and the Trenino Rosso travelling in the opposite direction.
In winter, an old 1913 steam rotary snowplow is regularly in service, but also two electrical from 1968 and also two modern engines from 2010 are used as well. Their operation is also a tourism that draws in railway enthusiasts from all over the world, especially for the steam one. The two Gem 4/4 assure the shunt of the rotary snowplow.
In connection with the danger of on the Bernina line, the Rhaetian Railway has developed an unusual procedure for the removal of these high alpine hazards. In late winter, when the risk of avalanche is greatest, artillery is fired at the points of origin of avalanches, to bring some control to their occurrence.
|
|